Construction of a 1 MW solar power plant: As a result of the investment, CO2 emissions in Miskolc will decrease by more than 1,000 tons annually. The modern solar power plant will be capable of over 90% rated power even after 15 years. The electricity generated by the solar power plant is transmitted to the institutions, which they use to the full, through the public electricity grid. The amount of energy produced by the solar power plant reduces the municipal electricity bill.
Biomass plant: A 3 MW biomass plant will be implemented within the framework of the greenfield investment for the project company established for the renewable energy-based supply of the district heating areas of Kilián and Dorottya Street. As a result of the investment, the heat production of several boiler houses was completely replaced. As a result of the investment, heat supplier MIHŐ Kft. provides natural gas firing only to cover the peak load for an outside temperature of approx. -2 ° C.
Landfill gas: In Miskolc, the plant utilizing landfill gas produced at the recultivated landfill on Bogáncs Street with a capacity of approx. 150 m3/h produces hot water for heating and domestic use, as well as electricity, as the gas engine is also connected to the electricity grid. Landfill gas is a significant greenhouse gas, so its energy use is a priority from an environmental point of view. As a result of the project, it has been providing district heating services with a biogas-fired boiler in the boiler house on Futó Street since 2009, and in 2010 biogas-based renewable electricity generation was also implemented.
Projects in the implementation phase:
- LIFE integrated urban air quality improvement project (1 M Euro)
Finished Projects:
- REMOURBAN - Horizon 2020 project for sustainable development of European cities (180 000 Euro)
- TRAM- Project for the Sustainable Transport Development of European Cities (EUR 172 000)